Penmann successfully delivered a tailored HVAC upgrade at Nutricia’s Liverpool facility, supplying a purpose-built ventilation and climate control system engineered to meet strict hygiene and production standards. The scope covered the design, supply, installation and commissioning of advanced HVAC systems across non-production, Medium Care (MC) and High Care (HC) areas. https://bookmark-rss.com/story20495999/penmann-ltd-completes-major-hvac-upgrade-for-nutricia-s-production-facility-in-liverpool-in-line-with-fsi-phase-1-and-2