Penmann successfully delivered a tailored HVAC upgrade at Nutricia’s Liverpool facility, providing a bespoke ventilation and climate control system designed to satisfy stringent hygiene and production requirements. The project included the complete lifecycle delivery of advanced HVAC systems across civil, Medium Care (MC) and High Care (HC) areas. Based on https://bookmarkblast.com/story20719854/penmann-completes-specialist-hvac-installation-for-the-liverpool-based-nutricia-facility-in-line-with-fsi-phase-1-and-2