Left: Inside the VAB, the crawler transporter positions by itself down below Mobile Launcher 1 in planning for rollout of SA-501 to your start pad – note the worker while in the foreground for sizing comparison. On arrival for the Vertical Assembly Building, Each and every phase was inspected https://harryz840ayw4.wikicorrespondent.com/user