At first, the Jai Hind metro station was prepared being elevated. However, the AAI objected which the elevated stretch up into the airport may well pose a menace to aircraft, so the route was more reworked as well as the station was shifted underground, 150 m with the Airport terminal https://franciscoiyaex.blue-blogs.com/39185721/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf