To begin with, the Jai Hind metro station was prepared to be elevated. However, the AAI objected the elevated stretch up on the airport may possibly pose a threat to plane, Therefore the route was even more reworked and the station was shifted underground, one hundred fifty m in the https://jaidenlzins.dsiblogger.com/65021732/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf