Then Tesla would just have GB/T, CCS1, and CCS2 requirements to handle in production. But as stated, the Products S and X would wish design alterations for An even bigger demand port. As of 2024 the Level 2 J1772 adapter (with NACS plug) remains utilised at most public AC charging https://most-southern-point-of-au63909.digitollblog.com/31221397/australia-s-southernmost-island-state-can-be-fun-for-anyone